CSPC Nanhai Petrochemicals Project/CSPC ÄϺ£Ê¯»¯ÏîÄ¿ Bechtel ¨C SEI ¨C Foster Wheeler PMC/ÏîÄ¿¹ÜÀí³Ð°üÉÌ
Superintendant or his designee. Any discrepancies found during the inspection will be addressed and corrected by the EPC and C contractors PEMOT and master mechanic as required.
ÔÚµõ³µºÍÆðÖØÉ豸½ø³¡ºó£¬BSF¼¼¹¤¹¤³¤»òÆäÖ¸¶¨ÈËÔ±½«¶Ô¸ÃÉ豸½øÐгõ²½ÑéÊÕ²¢¼Ç¼ÔÚ°¸¡£ÔÚÑéÊÕÖз¢ÏÖµÄËùÓÐÎÊÌâ¾ùÓ¦±¨¸æ²¢ÓÉPEMOT£¬±ØÒªÊ±£¬Óɼ¼¹¤¹¤³¤´¦Àí¡£
a. Crane inspections shall be conducted in accordance with applicable
crane manufacturers specifications and all applicable jurisdictional codes and standards.
µõ³µµÄÑéÊÕÓ¦¸ù¾ÝÏà¹ØµÄµõ³µ³§¼Ò¹æ·¶»òËùÓÐÏà¹ØµÄ¹ú¼Ò·¨¹æºÍ±ê×¼À´Ö´ÐС£
5.1.8 Upon successful completion of the initial and annual inspections a
jobsite load test is required. For all jobsite load testing, refer to Project Procedure PR-8710-0000-0010, Crane Load Test. An HSE Representative may be required to witness the test, depending upon project specific HSE procedures.
Ôڳɹ¦µØÍê³É³õ²½ÑéÊÕºÍÄê¼ìÖ®ºó£¬ÐèÔÚÏÖ³¡½øÐÐÊÔµõ¡£ÏÖ³¡ÊÔµõµÄϸ½ÚÓ¦²Î¿¼ÏîÄ¿³ÌÐòPR-8710-0000-0010£¬¡°µõ³µÊÔµõ¡±¡£¸ù¾ÝÏîÄ¿ÌØ¶¨ µÄHSEÒªÇ󣬿ÉÄÜÒªÇóHSE´ú±í¼ûÖ¤ÊÔµõ¡£
a) Load testing shall be conducted in accordance with Project
Procedure PR-8710-0000-0010, Crane Load Test, and any applicable jurisdictional codes, standards or regulations. Testing procedures must also adhere to crane manufacturer instructions and guidelines. A load test compliance certificate must be kept and updated. This certificate must be current at all times while performing lift operations.
ÊÔµõÓ¦°´ÕÕÏîÄ¿³ÌÐòPR-8710-0000-0010£¬¡°µõ³µÊÔµõ¡±ºÍÏà¹ØµÄ¹ú¼Ò·¨¹æ¡¢±ê×¼ºÍ¹æ³Ì½øÐС£ÊÔµõ³ÌÐò±ØÐëÂú×ãµõ³µ³§¼ÒµÄÒªÇóºÍ×¼Ôò¡£ÊÔµõºÏ¸ñÖ¤Ó¦Í×ÉÆ±£´æ²¢¸üС£ÔÚʵʩµõ×°²Ù×÷ʱӦȷ±£ÊÔµõºÏ¸ñÖ¤ÓÐЧ¡£
b) If the load test is not successful, then the PEMOT are to determine
the necessary corrections, prior to re-testing. All corrective actions are to be filed in the respective equipment maintenance file.
PR-8710-0000-0009, Rev. 03
Cranes Use and Operationµõ³µµÄʹÓúͲÙ×÷
Page 13 of 30
CSPC Nanhai Petrochemicals Project/CSPC ÄϺ£Ê¯»¯ÏîÄ¿ Bechtel ¨C SEI ¨C Foster Wheeler PMC/ÏîÄ¿¹ÜÀí³Ð°üÉÌ
Èç¹ûÊÔµõ²»³É¹¦£¬ÔòÔÚÔÙ´ÎÊÔµõǰ£¬PEMOTºÍ¼¼¹¤¹¤³¤Ó¦È·¶¨±ØÒªµÄ¾ÀÕý´ëÊ©¡£ËùÓеľÀÕý´ëÊ©¾ùÓ¦±£´æÔÚÏàÓ¦µÄÉ豸ά»¤ÎļþÖС£
5.1.9 Once the initial inspection and load test are satisfactorily completed,
and recorded/filed in the equipment file, then BSF will allow the equipment to be used on site.
³É¹¦µØÍê³É³õ²½ÑéÊÕºÍÊÔµõÇҼǼÒѾÔÚÉ豸ÎĵµÖб£´æºó£¬BSF½«Í¬Òâ¸ÃÉ豸ÔÚÏÖ³¡Ê¹Óá£
5.2
On-site Crane Operations & Maintenance Support »¤Ö§³Ö
During the course of a project, continuous inspections and maintenance is essential to the safe and reliable operation of cranes and lifting equipment. In order to assure reliable operation, daily, monthly and annual inspections are to be scheduled by the PEMOT on all lifting equipment on-site, and by the contractor for all own and/or third-party rental lifting equipment.
ÔÚÏîĿִÐйý³ÌÖУ¬ Á¬ÐøµÄ¼ì²éºÍά»¤¶Ô°²È«¿É¿¿µØ²Ù×÷µõ³µºÍµõ×°É豸ÊǷdz£ÖØÒªµÄ¡£Îª±£Ö¤¿É¿¿µÄ²Ù×÷£¬PEMOTÓ¦¶ÔËùÓÐBSFÏÖ³¡µÄµõ×°É豸ÅųöÈռ졢Ô¼ìºÍÄê¼ì¼Æ»®¡£³Ð°üÉ̺Í/»òµÚÈý·½ÆðÖØÉ豸×âÁÞÉÌÒ²Ó¦ÁгöÆäÏàÓ¦µÄ¼Æ»®¡£ The standard work process for the daily jobsite specific crane operations is specified below:
ÏÖ³¡Ìض¨ÆðÖØÉ豸ÈÕ¼ìµÄ±ê×¼³ÌÐòÈçÏ£º
5.2.1 Perform the initial set-up to prepare the crane for a lift. This initial set-up includes:
ʵʩ³õ²½ÉèÖã¬Ê¹µõ³µ×¼±¸¾ÍÐ÷¡£°üÀ¨£º
a) Crane placement: place matting (if required), extend outriggers (if
required) and level the crane.
µõ³µ¾Íλ£ºÆÌÉèµæ²ã£¨ÈçÓÐÐèÒª£©£¬Éì³öÖ§ÍÈ£¨ÈçÓÐÒªÇ󣩲¢µ÷ƽµõ³µ
Note: Ensure any ground preparation and compaction is performed where needed.
×¢£ºÈ·±£¸ù¾ÝÐèÒª½øÐг¡µØÆ½ÕûºÍº»Êµ¡£
b) Establish barriers/boundaries (where possible)
ÉèÖøôÀë×°ÖÃ/¸ôÀëÀ¸£¨Ìõ¼þÔÊÐíʱ£© c) Review lift plan (when required)
PR-8710-0000-0009, Rev. 03
Cranes Use and Operationµõ³µµÄʹÓúͲÙ×÷
Page 14 of 30
ÏÖ³¡µõ³µ²Ù×÷ºÍάCSPC Nanhai Petrochemicals Project/CSPC ÄϺ£Ê¯»¯ÏîÄ¿ Bechtel ¨C SEI ¨C Foster Wheeler PMC/ÏîÄ¿¹ÜÀí³Ð°üÉÌ
Éó²éµõ×°·½°¸£¨ÈçÓÐÐèÇó£©
d) Check load and travel path for any obstructions or interference
¼ì²éµõ×°ºÍÔËÊäͨµÀÉÏÊÇ·ñÓÐÕϰÎï¡£
5.2.2 The crane operator is to perform the daily inspection of the crane
utilizing the inspection forms provided by this procedure and the Project Equipment Maintenance and Operations team. If the crane is due for monthly or the annual inspection, ensure those inspections are performed as well.
µõ³µË¾»úÓ¦ÀûÓñ¾³ÌÐòºÍÏîÄ¿É豸ά»¤ºÍÔËÐÐС×éÌṩµÄ¼ì²é±í¶Ôµõ³µ½øÐÐÈռ졣µõ³µµ½ÆÚʱӦ½øÐÐÔ¼ì»òÄê¼ì£¬È·±£¶ÔÆä½øÐÐÏàÓ¦µÄ¼ì²é¡£
5.2.3 Based upon the inspections performed above, determine if the crane is
safe to perform its function. If it is determined during the inspection that there are equipment concerns that need to be resolved prior to performing a lift, the operator is to contact his supervision and the appropriate representative of the PEMOT to have the equipment concerns resolved.
¸ù¾ÝÉÏÃæµÄ¼ì²éÈ·¶¨µõ³µÊÇ·ñ¿ÉÒÔ°²È«ÔËÐС£Èç¹û¼ì²é¹ý³ÌÖз¢ÏÖÉ豸ÓÐÎÊÌâÇÒÓ¦ÔÚÆðµõǰ½â¾ö£¬²Ù×÷ԱӦ֪ͨÆäÖ÷¹ÜºÍPEMOTÖÐÏà¹ØµÄÈËÔ±ÒÔ½«¸ÃÎÊÌâ½â¾ö¡£
5.2.4 The maintenance team is to perform and record any corrective
maintenance (repairs) performed. If repairs are done to any of the crane load sustaining parts, then a load test shall be performed in accordance with PR-8710-0000-0010.
ά»¤Ð¡×齫ִÐв¢¼Ç¼ËùÓеľÀÕý´ëÊ©¡£Èç¹û¶Ô¸ÃÆðÖØÉ豸µÄ³ÐÖØ²¿·Ö½øÐÐÁËά»¤£¬ÔòÓ¦¸ù¾ÝPR-8710-0000-0010½øÐÐÊÔµõ¡£
5.2.5 Once the repairs (and load test, if required) are complete the operator
is to once again verify the crane readiness by completing a daily checklist.
ÔÚάÐÞ£¨ºÍÊÔµõ£¬ÐèҪʱ£©Íê³Éºó£¬²Ù×÷Ô±½«ÔٴβÉÓüì²é±íÉó²éµõ³µÊÇ·ñ¿ÉÒÔÖ´Ðеõ×°ÈÎÎñ¡£
5.2.6 Upon satisfactory completion of the daily checklist the crane operator is
to perform a final check to ensure all applicable lift criteria are met. Lift criteria can include such things as:
PR-8710-0000-0009, Rev. 03
Cranes Use and Operationµõ³µµÄʹÓúͲÙ×÷
Page 15 of 30
CSPC Nanhai Petrochemicals Project/CSPC ÄϺ£Ê¯»¯ÏîÄ¿ Bechtel ¨C SEI ¨C Foster Wheeler PMC/ÏîÄ¿¹ÜÀí³Ð°üÉÌ
Ôڳɹ¦µØÍê³ÉÈÕ¼ìºó£¬µõ³µË¾»ú½«×îÖÕ¼ì²é¸Ãµõ³µÊÇ·ñÂú×ãËùÓÐÏà¹ØµÄµõ×°±ê×¼£¬°üÀ¨£º
a) Wind-speed and weather conditions as stipulated by Crane
Manufacturer. ·çËÙºÍÆøºòÌõ¼þ
b) The crane is level and on firm ground.
µõ³µ´¦ÓÚˮƽ¡¢¼áʵµÄλÖÃ
c) The rigging is adequate for the lift and properly attached. Refer to
PR-8710-0000-0008, Construction Rigging Work Operations, for documentation required for the various categories of lifts.
Ë÷¾ßÊÇ·ñÊÊÓڸõõ×°¹¤×÷ÇÒÍ×ÉÆ°²×°¡£Óйظ÷ÖÖ·ÖÀàµÄµõ×°ÎļþÇë²Î¿¼PR-8710-0000-0008£¬¡°Ê©¹¤µõ×°²Ù×÷¡±¡£
5.2.7 Based upon the final check performed above, the operator is to
determine if the lift safe to perform. If it is determined during this final check that there are any concerns that need to be resolved prior to performing a lift, the operator is to contact his supervision to have the concerns resolved.
¸ù¾ÝÉÏÃæÊµÊ©µÄ×îÖÕ¼ì²é£¬²Ù×÷Ô±½«¾ö¶¨ÊÇ·ñ¿ÉÒÔ°²È«Æðµõ¡£Èç¹û×îÖÕ¼ì²é¹ý³ÌÖз¢ÏÖÓÐÐèÒªÔÚÆðµõǰ½â¾öµÄÎÊÌ⣬Ôò²Ù×÷ԱӦ֪ͨÆäÖ÷¹ÜÒÔ½«Æä½â¾ö¡£
5.2.8 Execute the lift ʵʩµõ×°
a) If at any time during the lift there is an unexpected problem,
concern, or situation that arises, secure the lift and report to supervision and the HSE representative on site. It will be the responsibility of supervision make to necessary adjustments and reports (as required). These reports may be up to and including a root cause analysis of the event. The supervisor and the HSE representative will use a graded approach to determine the extent of reporting required.
Èç¹ûÔÚÆðµõ¹ý³ÌÖз¢ÉúÔ¤ÆÚ²»µ½µÄÎÊÌâ¡¢¹ËÂÇ»ò¾ÖÃæ£¬Ó¦Á¢¼´Í£Îȵõ×°Îﲢ֪ͨÖ÷¹Ü¼°ÏÖ³¡µÄHSE´ú±í¡£Ö÷¹Ü¸ºÔð²ÉÈ¡±ØÒªµÄµ÷Õû²¢»ã±¨£¨ÈçÐèÒª£©¡£ÕâЩ»ã±¨¿ÉÉÏÖÁ£¨°üÀ¨£©Ê¼þµÄ¸ù±¾ÔÒò·ÖÎö¡£Ö÷¹Ü¼°HSE´ú±í½«¾ö¶¨ÐèÒª²ÉÈ¡µÄ»ã±¨·½·¨¡£
b) Upon successful completion of the lift, secure the crane.
PR-8710-0000-0009, Rev. 03
Cranes Use and Operationµõ³µµÄʹÓúͲÙ×÷
Page 16 of 30