云题海 - 专业文章范例文档资料分享平台

当前位置:首页 > F35项目风险管理

F35项目风险管理

  • 62 次阅读
  • 3 次下载
  • 2025/5/3 8:27:13

MOOG

AIRCRAFT GROUP

5. PROCESS AND TOOLS BAE Systems/Lockheed Martin uses Active Risk Manager (ARM) as their primary risk management tool. The WFAS team will not be an active user of this tool, but will provide data to BAE Systems/Lockheed Martin via the risk workbooks that are configured to feed input data directly into ARM. In turn, ARM will generate risk waterfall charts and risk summaries that will be transmitted back to Moog.

The WFAS team uses the following computer-based tools to carry out this Risk Management Plan: 5.1

Microsoft Excel

Microsoft Excel will be used to track and maintain the worry list. In addition Excel is used to create Risk Workbooks for each Moderate or High Risk, using the tailored templates presented in Appendix B. 5.2

Microsoft Project

Microsoft Project is the tool in which the program Program Master Schedule and detail schedules resides and thus contains the risk mitigation schedules. All Risk Mitigation Steps that appear in the Risk Mitigation Plans will be contained in these schedules. The appropriate schedule line number can be found in the Detailed Planning Ref # field in the Risk Workbooks and in ARM.

MOOG

MOOG INC. TORRANCE, CA 90501

CAGE CODE 0ZWK8

PAGE 9 OF 59

MRE13419

MOOG

AIRCRAFT GROUP

Appendix A Worry List

MOOG

MOOG INC. TORRANCE, CA 90501

CAGE CODE 0ZWK8

PAGE 10 OF 59

MRE13419

MOOG

AIRCRAFT GROUP

Risk # Category Title R01 R02 R03 R04 R05 R06 R07 R08 R09 R10

Corrosion of lugs Producibility High motor kinetic energy Creep in spread condition Weight* Motor Thermal Low Temp Operation Manual Drive Safety Switch Probability Performance Schedule Cost Low Mod Mod Min Mod Mod Mod Min Low Minor Minor Min Mod Minor Minor Minor Sig Low

Low Minor Minor Min Minor Low Minor Minor Mod Low

Low Mod Mod Min Mod Low Min Min Mod Low

Score Temp # 0.3 0.5 0.5 0.1 0.5 0.3 0.3 0.3 0.7 0.1 11 13 6 6 4 9 9 6 9 8 Motor Power Consumption @ Low Temperature Sig Fatigue Condition in Folded Position

Low

* Weight risk will be addressed by a list of weight reduction initiatives and weight reduction plan status.

Table 1.

WFAS Worry List

MOOG

MOOG INC. TORRANCE, CA 90501

CAGE CODE 0ZWK8

PAGE 11 OF 59

MRE13419

MOOG

AIRCRAFT GROUP

Table 2.

Risk Item R01

MOOG

MOOG INC. TORRANCE, CA 90501

CAGE CODE 0ZWK8

PAGE 12 OF 59

MRE13419

搜索更多关于: F35项目风险管理 的文档
  • 收藏
  • 违规举报
  • 版权认领
下载文档10.00 元 加入VIP免费下载
推荐下载
本文作者:...

共分享92篇相关文档

文档简介:

MOOG AIRCRAFT GROUP 5. PROCESS AND TOOLS BAE Systems/Lockheed Martin uses Active Risk Manager (ARM) as their primary risk management tool. The WFAS team will not be an active user of this tool, but will provide data to BAE Systems/Lockheed Martin via the risk workbooks that are configured to feed input data directly into ARM. In turn, ARM will generate risk waterf

× 游客快捷下载通道(下载后可以自由复制和排版)
单篇付费下载
限时特价:10 元/份 原价:20元
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:fanwen365 QQ:370150219
Copyright © 云题海 All Rights Reserved. 苏ICP备16052595号-3 网站地图 客服QQ:370150219 邮箱:370150219@qq.com