当前位置:首页 > 国家安全监管总局关于印发冶金等工贸行业小微企业安全生产标准化评定标准的通知(安监总管四〔2014〕17号)
5.5按规定配置消防设备设施,做到位置合理、标志明显,并定期检验有效,维护保养到位。 5.5 configuration fire equipment according to regulations, reasonable location, signs, and regular inspection and maintenance program in place. 2 未配备消防设备设施的,不得分;消防设备设施配备不能满足需要的,每处扣1分;位置不合理、标志不显的,每处扣0.5分;维护保养不到位,无责任人、无记录的,扣1分;现场有失效的,每处扣0.5分。 5.6主要设备设施应建立技术档案和记录,包括: (1)产品出厂合格证、使用维护说明、安装技术文件等资料; (2)日常维护保养记录; (3)运行故障和事故记录; (4)大修或改造记录。 5.6 main equipment facilities establish technical files and records. (1) quality certification, maintenance instructions, technical documents and other materials; (2) daily maintenance records; (3) the operation failure and accident records; (4) the repair records. 5.7危险化学品库、油库、油罐等重要设备设施应设置有可靠的安全设备设施,并有相应记录台账。 5.7 dangerous chemicals store, oil depot, oil tank and other important facilities should be set with reliable safety equipment and facilities, and have record of the account. 无产品出厂合格证、使用维护说明、安装技术文件等资料的,不得分;日常维护保养记录、运行故障和事故记录不完整、大修或改造记录不完整,每项扣0.5分。 2 2 危险化学品库、油库、油罐等重要设备设施无安全设备设施,不得分;安全生产设备设施不全的,每处扣0.5分;记录台账不全的,每处扣0.5分。 5.8传动部位应按照如下情况,设置防护罩、盖或栏: 5.8 Transmission parts should be according to the following situation, set cover, cover or bar: (1)以操纵人员站立平面为基准,高度在2m以下的外露传动部位; (2)旋转的键、销、楔等突出大于3mm的部位; (3)产生切屑、磨屑、冷却液等飞溅,可能触及人体或造成设备与环境污染的部位; (4)产生射线或弧光的部位; (5)伸入通道的超长工件; (6)超长设备后端300mm以上的工件; (7)容易伤人的设备往复运动部位; (8)悬挂输送装置跨越通道的下部; (9)高于地面0.7m的操作平台。 5.9吊具应有专人管理,在其安全系数允许范围内使用。钢丝绳和链条的安全系数和钢丝绳的报废标准,应符合《起重机械安全规程》(GB6067)的有关规定。 Sling should be responsible by the special person, used in the range of allowable safety coefficient.The safety factor of steel wire rope and chain and wire rope scrapping standard, should be consistent with the hoisting machinery safety regulation (GB6067) of the relevant provisions. 有一处不符合要求的,扣0.5分。 2 A place is not in conformity with the requirements, 0.5 points 未在安全系数允许范围内使用吊具的,不得分;未按规定报废的,不得分;相关管理人员和作业人员不清楚吊具安全系数和钢丝绳的报废标准的,不得分;有一个吊具不符合要求的,扣0.5分。 1 5.10电气设施、配电间环境及安全间距、门窗及孔洞等安全措施、警示标志及工作标志、绝缘及绝缘操作工具、照明及应急照明等措施符合要求,接地系统可靠连接,接点接触良好,接地可靠。手持电动工具、移动电气设备电源线应用护管软线,无接头及破损,电源应在末级装设剩余电流动作保护器。 5.10 electrical facilities, distribution room environment and safe spacing, doors and Windows and holes and other safety measures, warning marks and logo, insulation and insulation operating tools, measures to meet the requirements, such as lighting and emergency lighting system reliable grounding, contact contact is good, reliable grounding.Hand-held electric tools, mobile electrical equipment for power line protection pipe application soft lines, no joint and damaged, the power supply shall be erected at the last stage residual current protective device. 有一处不符合要求的,扣0.5分。 A place is not in conformity with the requirements, 0.5 points. (2) temporary low voltage electrical wiring should meet: deadline for 15 days, the formalities for approval set up safety;When the expected more than three months of temporary low voltage electrical lines, should be set to fixed line way;Path should avoid easily damaged insulation dangerous places, there are electrical exposed must be set when the pen or screen protection, and is equipped with warning signs;All electrical equipment, socket circuit, such as moving coil shall be connected to the trunk line PE and reliable;Lines should set the main switch (1)电网接地系统应满足:电气设备保护线(PE线)采用铜芯导线的最小截面当有机械性保护时为2.5 mm2,无机械性的保护时为4 mm2;接地网直接引入配电箱、柜或用电设备时,应接至主PE端子排;一般低压电力网中电源系统中性点工作接地应小于4Ω,TN系统每处重复接地网的接地电阻应小于10Ω;明敷的接地导体(PE干线)的表面应涂15mm-100mm宽度相等的绿、黄相间的标识条纹;当使用胶布时,应采用绿黄双色胶带。 (1)Grounding system should satisfy: (1) power electrical equipment protection line (PE) using the smallest section of copper wire was 2.5, when a mechanical protection without mechanical protection for 4 was;Ground net.through introducing distribution box, cabinet directly or electric devices, connected to the PE terminal row;General low-voltage power grid in the power system with neutral grounding should be less than 4 Ω, TN system of every repeat grounding network grounding resistance should be less than 10 Ω;Ming fu grounding conductor (PE trunk) surface should be coated with 15 mm - 100 mm width equal to the green, yellow and white logo stripes;When using tape, yellow green double color tape should be adopted. 3 (2)临时低压电气线路应满足:履行审批手续,期限为15天,架设安全;当预期超过三个月的临时低压电气线路,应按固定线路方式进行设置;路径应避开易造成绝缘损坏的危险地方,有电气裸露时必须设置围栏或屏护装置、并设有警示信号;所有用电设备、插座电路、移动线盘等应与主干PE线连接可靠;线路应设置总开关控制,且每台设备应配备专用开关,保护电器动作电流与切断时间可靠;严禁在有爆炸和火灾危险的环境中架设。 (3)动力(照明)配电箱(柜、板)应满足:配备满足环境要求;应采取通风、防尘、防飞溅、防雨水、防油污、防小动物的措施;刀闸、开关、接触器应动作灵活、接触可靠、合闸到位,触头无烧损;插座回路应有单独电源开关控制,每一回路插座数量不宜超过10个,用于计算机电源的插座数量不超过5个;总开关电器的额定值,动作整定值应与分路开关电器的额定值、动作整定值相适应,并应具备电源隔离(明显断开点)、短路过载、单相故障电流回路切断保护功能。 (3) (lighting) power distribution box (cabinet, board) should satisfy: equipped with meet environmental requirements;Ventilation, dust, prevent splash, should be taken to prevent the rain, prevent oil, prevent measures of small animals;Knife switches, switch, contactor action should be flexible, reliable contact, closing in place, contact without burning;Socket circuit should be separate control power switch, socket number each time road should not be more than 10, the number of socket used in computer power supply is not more than five (5);The set values for the main switch electrical ratings, the movement should be with the set values for the shunt switch electrical ratings, action, and shall have the power isolation (obvious disconnect point), short circuit, overload, single phase fault current circuit to cut off the protection function. (4)固定电气线路应满足:裸导体线路室内敷设不应与起重机滑线设在同侧;与地面无遮拦布线时最小净距为3.5m,采用网孔遮拦是最小净距为2.5m;敷设在经常维修管道同侧上方;与经常维修管道,以及与生产设备最突出部位最小净距为1.8m;与起重机铺板最小净距为2.3m;埋地敷设的电线管应采用大于2.5mm的厚壁钢导管;电线管口端应无毛刺和尖锐棱角,管口应加装软套;绝缘导线穿管敷设时,导管内导线的总面积应小于管子截面积的40%;正常场所不得采用塑料管埋地布线。 control, and each device should be equipped with a dedicated switch, protection of electrical current action and the cut off time and reliable;It is strictly prohibited in the explosion and fire dangerous environment set up. (4) fixed electrical wiring should meet: indoor laying bare conductor line should not be with the crane slip line is located in the same side;Without block wiring with the ground when the minimum clear distance of 3.5 m, with mesh block is the minimum interval of 2.5 m;In frequent servicing duct ipsilateral above;And often pipeline maintenance, and production equipment of the most prominent part minimum interval of 1.8 m;With the crane ceiling minimum clear distance of 2.3 m;Buried wire tube should be greater than 2.5 mm thick wall steel pipe;Wire and pipe end should be no burr and sharp edges, nozzle should be equipped with soft set;Insulated wire wear pipe laying, the area of the intraductal conductor should be less than 40% of the area of the pipe;Normal place may adopt plastic pipe buried wiring. (1) pressure vessel Should satisfy: pressure vessel ontology and safety accessories used for the period of validity of the test, the ontology in good condition;No abnormal vibration, friction, loose connection components;Safety accessories, display, 5.11特种设备应有产品合格证、使用登记证、法定资质单位的定期检测报告,各类安全装置可靠、有效。 5.11 special equipment shall have the product certificate, use registration certificate, the legal qualification unit of regular inspection report, all kinds of safety device is reliable and effective. 3 (1)压力容器应满足:压力容器本体及安全附件在检验有效期内使用,本体完好;连接元件无异常振动、磨擦、松动;安全附
共分享92篇相关文档