ÔÆÌ⺣ - רҵÎÄÕ·¶ÀýÎĵµ×ÊÁÏ·ÖÏíÆ½Ì¨

µ±Ç°Î»ÖãºÊ×Ò³ > BG seadrill procedureº£ÉϽµÂä»úƺ¹ÜÀíÓë²Ù×÷³ÌÐò£¨·­Òë°æ±¾£©

BG seadrill procedureº£ÉϽµÂä»úƺ¹ÜÀíÓë²Ù×÷³ÌÐò£¨·­Òë°æ±¾£©

  • 62 ´ÎÔĶÁ
  • 3 ´ÎÏÂÔØ
  • 2025/5/2 6:52:56

Page 5 of 31

Control and monitoring functions available at each Manual Release Box: ÔÚÿһ¸öÈ˹¤ÊͷŵĿØÖƺÐÖпØÖƺÍÅçÍ·Ãð»ðµÄ¹¦ÄÜ

? Foam monitor start (open valve) ÅÝÄ­ÅçÍ·Æô¶¯£¨´ò¿ª·§ÃÅ£©

? Foam monitor stop (System Reset) ÅÝÄ­ÅçÍ·Í£Ö¹£¨ÏµÍ³ÖØÖã©

? Foam monitor valve opened indication ÅÝÄ­ÅçÍ··§ÃÅ´ò¿ªÖ¸Ê¾

? Control and monitoring functions available at the Remote Control Panel : ÔÚÒ£¿Ø¿ØÖÆÃæ°åÉÏ¿ØÖƺÍÃð»ðÅçÍ·µÄ¹¦ÄÜ ? Foam monitor 1 Operate system (release) ÅÝÄ­ÅçÍ·1ºÅ²Ù×Ýϵͳ£¨ÊÍ·Å£©

? Foam monitor 2 Operate system (release) ÅÝÄ­ÅçÍ·2²Ù×Ýϵͳ£¨ÊÍ·Å£©

? Foam monitor 3 Operate system (release) ÅÝÄ­ÅçÍ·3²Ù×Ýϵͳ£¨ÊÍ·Å£© ? Foam Pump start ÅÝÄ­Ë®±ÃÆô¶¯ ? Foam pump stop ÅÝÄ­Ë®±ÃÍ£Ö¹ ? System reset ÏµÍ³ÖØÖÃ

? Foam monitor 1 valve opened indication ÅÝÄ­Ãð»ðÅçÍ·1ºÅ·§ÃÅ´ò¿ªÖ¸Ê¾

? Foam monitor 2 valve opened indication ÅÝÄ­Ãð»ðÅçÍ·2·§ÃÅ´ò¿ªÖ¸Ê¾

? Foam monitor 3 valve opened indication ÅÝÄ­Ãð»ðÅçÍ·3·§ÃÅ´ò¿ªÖ¸Ê¾ ? Foam Pump running indication ÅÝÄ­Ë®±ÃµÄÔËÐÐÇé¿öָʾ

Interface with the F&G system ÓëF&GϵͳµÄ½»ÈÚ

The Foam Main Control Panel is connected to the F&G system and the foam fire fighting system status is indicated on the F&G workstation. When the Foam release PB is pressed in the Helideck Foam monitors, it gives signal to the Main Control Panel for Foam release. Simultaneously, signal is also sent to F&G system Panel to start Fire Water Pump. So, the Fire water Pump would be started whenever the Foam monitor is operated from the Foam platform PB. ÅÝÄ­Öì¿ØÖÆÃæ°åÓë£Æ£¦£ÇϵͳÁ¬½Ó£¬ÅÝÄ­Ãð»ðϵͳµÄ¹¤×÷״̬ÔÚF&GºÍ¹¤×÷Õ¾ÖÐÏÔʾ¡£µ±ÅÝÄ­ÊÍ·ÅPB¼Óѹµ½Ö±Éý»ú»úƺµÄÅçÍ·£¬ÏµÍ³¾Í¸øÖ÷¿ØÖÆÃæ°åÊäËÍÅÝÄ­ÊͷŵÄÐźš£Í¬Ê±£¬ÐźÅͬÑù±»´«Êäµ½£Æ£¦£Çϵͳ¿ØÖÆÃæ°å£¬Æô¶¯Ïû·ÀË®±Ã¡£Ïû·ÀË®±Ã¿ªÆô£¬´ÓÅÝĭƽ̨£Ð£ÂµÄÅÝÄ­ÅçÍ·£¬ÎÞÂÛʲôʱºò¹¤×÷¡£

The signals sent to the F&G system are: ´«Êäµ½£Æ£¦GϵͳµÄÐźÅÊÇ

? Foam Pump Running ÅÝÄ­±ÃµÄÔËÐÐ

? Foam Pump Tripped ÅÝÄ­±ÃµÄÔËÐÐ״̬

? System Power Supply Available ϵͳµÄµçÁ¦¹©¸ø

? Foam line valve opened ÅÝÄ­¹ÜÏß·§ÃŵĿªÆô ? Water line valve opened

5

Page 6 of 31

Ë®¹ÜÏß·§ÃŵĿªÆô

? Foam monitor 1 valve Opened ÅÝÄ­ÅçÍ·1ºÅ·§ÃŵĿªÆô

? Foam monitor 2 valve Opened ÅÝÄ­ÅçÍ·2ºÅ·§ÃŵĿªÆô

? Foam monitor 3 valve Opened ÅÝÄ­ÅçÍ·3ºÅ·§ÃŵĿªÆô Fire water Pump start

3.3.2 Combined Foam/ Dry Powder System ÅÝÄ­ºÍ¸É·Û×éºÏϵͳ

Two combined foam / dry powder fire fighting units are installed for the purpose of extinguishing minor fires. Hoses with nozzles are installed at the port forward and starboard forward foam monitors . Each set is equipped with 2 hoses and nozzles. The hoses and nozzles of the foam and powder system are connected with each other by a metal frame which can be hung around the operators neck by a strap. For proper operation all hose on the reel will need to be flaked out.

Á½×éÅÝÄ­ºÍ¸É·Û×éºÏϵͳµÄÏû·ÀÃð»ðÉ豸°²×°µÄÄ¿µÄÔÚÓÚÕë¶ÔÇá¶È»ðÔֵįËÃð¡£´øÓÐÅçÍ·µÄÏû·À¹ÜÏß°²×°ÔÚ³ö¿ÚµÄǰ£¬Æô¶¯Ãæ°å³¯ÏòÅÝÄ­ÅçÍ·¡£Ã¿Ò»Ì×´øÓÐÁ½¸ö¹ÜÏߺÍÅçÍ·¡£ÅÝÄ­¡¢¸É·ÛµÄ¹ÜÏߺÍÅçÍ·ÀûÓýðÊô½á¹¹Á¬½ÓÔÚÒ»Æð£¬¿ÉÒÔÀûÓôø×Ó¹ÒÔÚʹÓÃÕߵļç°òÉÏ¡£ÎªÁËÕýȷʹÓã¬ËùÓеĹÜÏßÅ̾íÆðÀ´£¬²¢·ÀÖ¹ÀÏ»¯¡£ Storage tanks are located below the helpdesk containing 250 litres of foam concentrate and 250 kgs of powder..

´¢´æ¹àλÓÚÖ±Éý»ú»úƺÏÂÃæ£¬´æÁ¿Îª250ÉýÅÝÄ­ºÍ250¹«½ïµÄ¸É·Û¡£

3.3.3 Fireman¡¯s equipment and emergency equipment to be kept in the vicinity of the helideck. (min requirements).

Ïû·ÀÈËÔ±µÄÉ豸ºÍÓ¦¼±É豸´æ·ÅÔÚÖ±Éý»ú»úƺµÄ¸½¼þ£¨×îµÍÉ豸ҪÇó£©

- 2 Fire suits ( complete with boots, helmets, gloves) 2Ì×Ïû·À·þ£¨´ÓÍ·µ½½Å´øÑ¥×Ó£¬Í·¿ø¡¢ÊÖÌ×£© - 2 Fire Axes 2 ¸öÏû·À¸«Í·

- 2 Stainless knives ( for cutting seat belts) 2 °É²»Ðâ¸ÖСµ¶ - 2 Hand lamps 2 °ÑÊÖµÆ - 1 Crow bar 1 ÌúÇË

- 1 Pair of cutting pliers Ò»¸±±â×ìǯ×Ó

- 1 Hack saw with spare blade ¹­Ðξâ×Ó´ø±¸·Ýµ¶¿Ú - 1 Hammer 1 °Ñ´¸×Ó

- 1 Steel bar with a wedged tip 1 Ìõ´ø¼âµÄ¸Ö¹÷

- 1 Pair of sheet metal shears

Ò»¸±½ðÊô¼ô

Uncontrolled when printed

Last printed 19.10.2010 20:19 Page 3 of 16

6

Page 7 of 31

- 1 Bolt cutter 1¶ÏÏßǯ×Ó

- 1 Lightweight ladder (approx. 3 meter) 1 °ÑÖØÁ¿ÇáµÄÌÝ×Ó£¨´óÔ¼3Ã׳¤£© - 1 Jack for at least 0.5 ton 1 Äܶ¥Æð0.5¶ÖµÄǧ½ï¶¥

- 1 Metal hook with a shaft (approx. 3 meters) Ò»°Ñ´ø±úµÄ½ðÊô¹³£¨3Ã׳¤£©

Fire suits are located in the helideck reception office ( to be checked) Ïû·À·þװλÓÚÖ±Éý»ú»úƺµÄ½Ó´ý°ì¹«ÊÒÄÚ£¨¸ú½øºËʵ£©

Emergency equipment is located at aft entrance of helideck close to aft foam monitor and at starboard side close to starboard foam monitor

Ó¦¼±É豸λÓÚÖ±Éý»ú»úƺµÄÈë¿Ú´¦£¬¿¿½üÅÝÄ­ÅçÍ·µÄºóÃæ£¬Æô¶¯¿ØÖưåÔÚ¿¿½üÆô¶¯°åÅÝÄ­ÅçÍ·µÄÒ»°õ¡£

3.3.4 Additional fire fighting equipment ( min requirements , list to be updated to actual situation)¸¨ÖúÃð»ðÉ豸£¨×îµÍÒªÇó£¬Çåµ¥¸ù¾Ýʵ¼ÊÇé¿ö½øÐиüУ©

-

3 CO2 extinguishers , 10kgs , with extension hose and nozzle able to reach helicopter engine intakes. A CO2 unit is located in close vicinity of each fire monitor.

3¸ö10¹«½ï¶þÑõ»¯Ì¼µÄÃð»ðÆ¿£¬´øÓÐÑÓÉì¹ÜÏߺÍÅç×ì¿ÉÒÔµ½´ïÖ±Éý»ú·¢¶¯»ú½øÆøµÀ¡£ACO2 Ãð»ðÉ豸

λÓÚÿһ¸öÅçÍ·µÄ¸½½ü¡£

- 2 Fire hydrants with hose reels in vicinity of helideck. Located at starboard monitor - 2¸öÏû·À˨´øÓÐÔ²Å̹ÜÏßλÓÚÖ±Éý»ú»úƺÆô¶¯ÅçÍ·µÄ¸½¼þ¡£

3.3.5 Helicopter communication equipment Ö±Éý»úͨÐÅÉ豸

- 2 permanently installed aero mobile radio sets on the bridge, to listen in on two different frequencies simultaneously.

2Ì×ÓÀ¾Ã°²×°º½¿ÕÒÆ¶¯µç̨·Ö²¼ÔÚÁºÇÅÉÏ£¬Í¬Ê¿ÉÒÔ¼àÌýÁ½¸ö²»Í¬µÄƵÂÊ¡£

- 2 portable aero mobile radios, operated by the HLO during helicopter operations. - 2Ì׿ÉÒÔÊÖÌáµÄº½¿ÕÒÆ¶¯ÎÞÏߵ磬ÓÉÖ±Éý»úÖ¸»ÓÔ±ÔÚÖ±Éý»úÔËÐÐÆÚ¼äʹÓá£

Wind, visibility as well as the vessel's movements put limits on helicopter operations. No helicopter operations shall take place if the wind force is or exceeds 60 knots. ·çÁ¦¡¢Äܼû¶È¡¢´¬µÄÔËÐжÔÖ±Éý»úµÄÔËÐÐÔì³ÉÏÞÖÆ¡£µ±·çÁ¦·çËÙ³¬¹ý60º£Á¨£¬½ûÖ¹Ö±Éý»úÔÚ±¾ÉèÊ©ÔËÐС£ If the vessel's movements exceed the below-mentioned values, helicopter operations should be avoided. Such a decision shall be discussed in close consultation with the helicopter pilots.

Èç¹û´¬µÄÔËÐж¯Ì¬³¬³öÏÂÃæÌá¼°µÄ±ê×¼ÊýÖµ£¬½ûÖ¹Ö±Éý»úÔËÐС£ÕâÑùµÄ¾ö¶¨Ó¦¸Ã×ÉѯֱÉý»ú·ÉÐÐÔ±¡£ 4 Helicopter operation limitations and personnel organisation

Ö±Éý»úÔËÐÐÏÞÖÆºÍÈËÔ±½á¹¹

4.1 Helicopter Landing Limitations and Precautions

Ö±Éý»ú×ÅÂäÏÞÖÆºÍ°²È«´ëÊ©

Visual and Instrument Flight Regulations ÄܼûÔËÐкÍÒDZíÔËÐй涨

VFR and IFR Weather minimum - helicopter operations shall comply with local aviation regulations. However, where they are less conservative, the following apply to weather minimum.

ÄܼûºÍÒDZíÌìÆø±ê×¼-Ö±Éý»úÔËÐбØÐë×ñÊØµ±µØÃñº½º½¿Õ¹æÕµÄÒªÇó¡£È»¶ø£¬Èç¹ûµ±µØµÄ±ê×¼µÍÓÚ±¾³ÌÐò±ê×¼£¬Ó¦¸ÃʹÓÃÒÔÏÂÌṩµÄÌìÆø±ê×¼¡£

7

Page 8 of 31

IFR Offshore approach minimum. ÒÇ±íº£ÉϽø½üÌìÆø±ê×¼

Conditions Ìõ¼þ Cloud base ÔÆ¸ß Visibility Offshore Day º£Éϰ×Ìì Offshore Nightº£ÉÏÒ¹¼ä

Uncontrolled when printed 8

200' 300' Last printed 19.10.2010 20:19 Äܼû¶È 800 m 1 200 m Page 4 of 16

ËÑË÷¸ü¶à¹ØÓÚ£º BG seadrill procedureº£ÉϽµÂä»úƺ¹ÜÀíÓë µÄÎĵµ
  • ÊÕ²Ø
  • Î¥¹æ¾Ù±¨
  • °æÈ¨ÈÏÁì
ÏÂÔØÎĵµ10.00 Ôª ¼ÓÈëVIPÃâ·ÑÏÂÔØ
ÍÆ¼öÏÂÔØ
±¾ÎÄ×÷Õߣº...

¹²·ÖÏí92ƪÏà¹ØÎĵµ

Îĵµ¼ò½é£º

Page 5 of 31 Control and monitoring functions available at each Manual Release Box: ÔÚÿһ¸öÈ˹¤ÊͷŵĿØÖƺÐÖпØÖƺÍÅçÍ·Ãð»ðµÄ¹¦ÄÜ ? Foam monitor start (open valve) ÅÝÄ­ÅçÍ·Æô¶¯£¨´ò¿ª·§ÃÅ£© ? Foam monitor stop (System Reset) ÅÝÄ­ÅçÍ·Í£Ö¹£¨ÏµÍ³ÖØÖã© ? Foam monitor valve opened indication ÅÝÄ­ÅçÍ··§ÃÅ´ò¿ªÖ¸Ê¾ ? Control and monitoring functions available at the Remote Control Panel

¡Á ÓοͿì½ÝÏÂÔØÍ¨µÀ£¨ÏÂÔØºó¿ÉÒÔ×ÔÓɸ´ÖƺÍÅŰ棩
µ¥Æª¸¶·ÑÏÂÔØ
ÏÞÊ±ÌØ¼Û£º10 Ôª/·Ý Ô­¼Û:20Ôª
VIP°üÔÂÏÂÔØ
ÌØ¼Û£º29 Ôª/Ô ԭ¼Û:99Ôª
µÍÖÁ 0.3 Ôª/·Ý ÿÔÂÏÂÔØ150·Ý
ȫվÄÚÈÝÃâ·Ñ×ÔÓɸ´ÖÆ
VIP°üÔÂÏÂÔØ
ÌØ¼Û£º29 Ôª/Ô ԭ¼Û:99Ôª
µÍÖÁ 0.3 Ôª/·Ý ÿÔÂÏÂÔØ150·Ý
ȫվÄÚÈÝÃâ·Ñ×ÔÓɸ´ÖÆ
×¢£ºÏÂÔØÎĵµÓпÉÄÜ¡°Ö»ÓÐĿ¼»òÕßÄÚÈݲ»È«¡±µÈÇé¿ö£¬ÇëÏÂÔØÖ®Ç°×¢Òâ±æ±ð£¬Èç¹ûÄúÒѸ¶·ÑÇÒÎÞ·¨ÏÂÔØ»òÄÚÈÝÓÐÎÊÌ⣬ÇëÁªÏµÎÒÃÇЭÖúÄã´¦Àí¡£
΢ÐÅ£ºfanwen365 QQ£º370150219
Copyright © ÔÆÌ⺣ All Rights Reserved. ËÕICP±¸16052595ºÅ-3 ÍøÕ¾µØÍ¼ ¿Í·þQQ£º370150219 ÓÊÏ䣺370150219@qq.com