脱 外 皮 (Cut off jacket) ?????????????????? 1.1

— 理 线 (Separate wire) ?????????????????? 1.2

— — — — — — — — — — — — — — — — — — — — — —

剥 芯 线 (Peel core wire) ?????????????????? 1.3 穿 套 管 (Pull on Tube) ?????????????????? 1.4 吹 套 管 (Shrink Tube) ??????????????????? 1.5 打磨耳机头 (Wear away earphone Plug) ???????????? 1.6 预 锡 (Immerse the tin) ????????????????? 1.7 焊 锡 (Soldering) ???????????????????? 1.8 目视锡点 (Tin spot inspection) ??????????????? 1.9 电 测 一 (The first Electric Testing) ???????????? 1.10 成型内模 (Inner-Molding) ???????????????? 1.11 电 测 二 (The second Electric Testing) ??????????? 1.12 包 铜 箔 (Wrap Copper Foil) ????????????????? 1.13 修剪编织 (Clipping Braid) ?????????????????? 1.14 环焊铜箔 (Soldered Around Copper Foil) ???????????? 1.15 清洗铜箔 (Copper foil cleaning) ??????????????? 1.16 成型外模 (Outer-Molding) ????????????????? 1.17 外观目视 (Appearance Visual Inspection) ??????????? 1.18 组 装 (Fabricate) ??????????????????? 1.19 铆 压 (Crimping) ???????????????????? 1.20 装 配 (Assembly) ??????????????????? 1.21 成品电测 (Manufacture Electric Capability Test) ??????? 1.22 贴 标 签 (Attach Labels) ?????????????????? 1.23 终 检 (Final Inspection)?????????????????? 1.24

— 包 装 (Packing) ????????????????????? 1.25

Page 1 of 41

CABLE加工中英文翻译

1.1 脱外皮 (Cut off Jacket) 合格(OK)

— 根据脱皮长度调整好脱皮机的定位螺杆。

In accordance with the length of jacket to adjust positioning bolt of machine.

— 将线材脱皮端顶住定位杆,紧靠刀口。

Used top of cable adjoin positioning bolt of machine, abutted blade.

— 用脚启动开关,脱去外皮。

Startup switching by foot, cut off jacket.

— 检查第一根线材的脱皮长度,调整螺杆位置,使尺寸满足公差要求。

Check the first cable’s length, adjusting bolt position, Make the dimension meet the tolerance’s requirement

— 脱掉的线材外皮要放入指定地点,不能任意丢

弃.脱外皮时切口处要平整,不可刮伤芯线的绝缘层。

Put the peeled cable in appointed position, without arbitrary discarding. The cut should level up, and without core insulation layer scratch.

— 同轴电缆或带有屏蔽的线缆脱外皮时,

不得刮伤编织超过5%.

When peel coaxial-cable or shielded cable, the scratch braid should be less than 5%.

— 脱外皮不平整。

scraggly jacket.

机器设备(Equipment): 脱皮机(Peeling machine), 热剥机(Hot divesting machine)

— 刮伤编织超过5%,刮伤芯线绝缘层露出芯线。

Scratch braid more than 5%, and the scratch core insulation layer

bare the core.

1.2 理 线 (Separate Wire)

— 将所需反折编织线反折。将地线拧成一股,然后用锥子

将包住芯线的铝箔挑干净。

Anti-fold the braids that need be anti-folded, tweak them into a sheaf, And then sweep the aluminum foil with an awl.

— 两端的地线要拧紧,编织要全反折过来,用透

Page 2 of 41

CABLE加工中英文翻译

明胶纸贴住。

Wring both side of drain, Braid had been folded back, Braid had attached in sticky and clear tape

— 使用锥子与剪刀的刀口要朝外, 以免伤及芯线外被。

In order to prevent the cords damaging,

blade of scissors and awl should point to the outside 机器设备:锥子,剪刀 Equipment:Awl , Scissors

1.3 剥芯线 (Peel core wire)

1.

全剥:将需要剥掉的芯线绝缘皮完全拉离芯线。 Wholly peeling: Insulation of wire had pulled off.

2. 半剥:将需要剥掉的芯线绝缘皮拉开,但仍套在芯线上。

Peel a half insulation:Insulation should put aside a half part in conductor.

— 不论是全剥还是半剥,将芯线对准剥线钳相应孔径,

绝缘皮的切断面都应该是平整的,如果有倾斜,则落差 最大不应超过1.0MM。

Whether it had peeled whole insulation or a half insulation, wire should been located in blade of fix in with location, Incision of jacket wasn’t gap, if incision of jacket was inclination, it is no less than Max 1.0MM.

— 线材未脱完全时留下的尾巴MAX:0.4MM。

Insulation of tail dimensions were 0.4mm (Max).

— 半剥作业时不可将绝缘皮完全拉脱。

It couldn’t been pull off when a half insulation had been peel.

— 半剥时拉开的距离以绝缘皮不易脱落为准,原则上约

为半剥尺寸的1/3左右,客户另有要求除外。 It couldn’t break away from conductor when jacket had been pull off a half part, about 1/3 of dimension should put aside in conductor. There is an exception to request of client.

机器设备:剥线钳,热剥机

Equipment : divesting clamp, Hot divesting machine — 剥皮时外皮不可有撕裂现象。

Jacket couldn’t have phenomena of avulsion.

— 不可有绝缘皮没完全切断。

Jacket hadn’t been entirely cut out.

Page 3 of 41

CABLE加工中英文翻译

— 剥芯线时芯线断股(刮伤)允收标准:

Conductor breaks off (damage) after maximum permissible standard:

— 半剥时外皮被刮起是不合格的。

This product does not measure up when Peeling

a half insulation bring on shaving.

— 倾斜落差超过1.0MM的为不合格。

It does not measure up when the distance that something Slope is1.0mm

— 剥皮后留下的尾巴超过0.4MM的为不合格。

This product does not measure up when insulation of tail dimensions were 0.4mm (Max).

1.4 穿套管(Pull on Tube)

— 先将编织或地线用绕线夹均匀绞在一起。

Braid or Drain have twisted together uniformity to using nip.

— 在给编织或地线穿套管时,套管尽量靠近编织或地

线根部

When Braid or Drain had been pulled on tube, tube close up base of Jacket.

— 要将地线或编织全部套进套管内,不可有地线漏出现象。

Tube must cover full of Braid or drain, not basset them.

— 穿完套管后,如果不立即进行下一步的作业,应将套管

前端露出的芯线弯折成90°形状,以防止套管滑落。 If TUBE had been fitted on so that next task can’t process, the front of protruding conductor become bend 90°, prevent tube from dropping.

— 编织或地线没有全部套进套管内,漏出是不合格的。

The braids or drains have not been wrapped by the tube totally. Leakage will be rejected.

1.5 吹套管(Shrink Tube)

— 吹套管时距离吹风筒3-5cm,旋转线材套管部分烘烤

时间2-4S,吹烤时要让套管均匀的收缩,紧紧的包 裹在材料上,套管不可有滑动现象。

Keep the cable from the breeze canister for 3-5cm, then rotating the tube part of the cable. Baking the tube for 2-4 seconds, keeping the tube shrink evenly and enwrap on the material closely, the tube Page 4 of 41

搜索更多关于: CABLE加工英语 的文档
  • 收藏
  • 违规举报
  • 版权认领
下载文档10.00 元 加入VIP免费下载
推荐下载
本文作者:...

共分享92篇相关文档

文档简介:

CABLE加工中英文翻译 — 脱 外 皮 (Cut off jacket) ?????????????????? 1.1 — 理 线 (Separate wire) ?????????????????? 1.2 — — — — — — — — — — — — — — — — — — — — — — 剥 芯 线 (Peel core wire) ?????????????????? 1.3 穿 套 管 (Pull on Tube) ?????????????????? 1.4 吹 套 管 (Shrink Tube) ??????????????????? 1.5 打磨耳机头 (Wear away earphone Plug) ???????????? 1.6 预 锡

× 游客快捷下载通道(下载后可以自由复制和排版)
单篇付费下载
限时特价:10 元/份 原价:20元
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:fanwen365 QQ:370150219
Copyright © 云题海 All Rights Reserved. 苏ICP备16052595号-3 网站地图 客服QQ:370150219 邮箱:370150219@qq.com