radiation, and the frame adopts the bridge-cutting energy saving. Steel frame should get hot galvanizing and anti corrosion treatment and the alloy window is treated with anodizated compoundd film, thickness ≥7.5μm. 2.2门卫配电房工程Substation & Gate house

2.2.1门卫配电房的建筑面积为:316.38平方米, 一层框架结构; The building area for Substation & Gate house is 316.38m2, and the structure form is one floor reinforcement concrete frame.

2.2.2门卫配电房基础采用独立柱基础,承台及基础梁为C25钢筋混凝土;The foundation is independent column base, the pilecap and foundation beam is C25 concrete.

三、施工准备 Preparations for the Commencement

3.1现场准备 Site Preparation

3.1.1按施工现场平面布臵图搭建生产和生活临时设施,做好现场临时施工道路、施工用水电的布臵、现场污水、雨水排放明沟,现场安全防护设施搭建等工作。Set up the temporary facilities for site production and life as per the site layout. Prepare well the temporary access, water and power, sewage disposal, rain water discharge and the safety protection facilities and etc. for the commencement.

3.1.2布臵好现场的工程概况牌、安全生产标志牌、劳动纪律牌等“二图六牌”。Set up at the site the two charts and six boards: the project plate, safe production marks, work disciplines board and etc.

3.1.3组织施工人员进场,并做好各项教育工作。Organize the work force, move into the site and do well educational work and others.

3.2施工技术准备Preparations for execution techniques

Page 9 of 92

施工技术准备的主要内容,可以归纳为以下四个方面:一是组织图纸会审;二是编制开工前的各项方案、措施;三是进行工程定位,开展施工测量;四是完成技术、检验机制的建立。其具体内容是:The main thing in this regard are the following four parts: study and examine the drawings; work out the schedules for the commencement; start the project location and surveying work; establish the mechanism of the technique identification and quality inspection. The details are:

3.2.1及时组织技术人员,预算员认真熟悉施工图纸,参与图纸会审和技术交底; Timely organize the technicians and quantity surveyors to get familiar with all the drawings. They shall participate in the drawings studying and examining, and explain all the technical details.

3.2.2编制施工图预算和月旬作业计划,提供材料的需要量计划; Work out the project budget and the schedules for monthly and 10-day’s site work, and also the materials supply plan.

3.2.3商请建设单位组织移交、规划红线、座标、标高等;Consult with the Client to hand over the site, plot lines, bench marks and levels, etc.

3.2.4组织专业技术人员进行模板和钢筋的翻样工作; Organize the professional technicians to work out shop drawings for all the moulding board and steel work.

3.2.5做好各种进场材料的质量检验及砼配合比的试配等准备工作。Do a good job in checking all those materials to be brought into the site and concrete mix preparations.

3.2.6根据工程施工需要,结合外围电网的情况和市政供水管网的情况,进行施工用电用水设计。Work out the consumption schedule for the water and power needed for the project as per the requirements of the project execution and the status of electricity grid and city

Page 10 of 92

water supply.

3.3主要机械设备、周转材料及劳动力资源配备Preparations of Major mechanical

equipments, cycling materials and work forces

根据本工程的施工规模及结构形式,为了顺利快速地完成本工程,交付给业主早日投产使用,拟投入的机械设备及劳动力详下表。As per the project scale and structural formation and in order to smoothly complete the execution so as to hand over to the client for the early operation, it is proposed to allocate of the following equipments and labor forces as the form listed below:

主要施工机械和材料一览表

Major Machines and Materials for the Project

用电量/台序号S.No 名称Descriptions 型号 Model 数量Q’ty 单位(KW) Power Unit Consumption 1 挖掘机 Excavator 2 砼搅拌机JZC350 Concrete Mixer 3 砂浆拌和机UJ200 Mortar Mixer 4 塔吊 QTZ60T.M Tower Crane 1 Unit 2 Unit 台 陆 2 Unit 台2.2 日 期 4 Unit 台5.5 开 工 辆2.8 实 际 in 按 Date to bring 进场安排 Page 11 of 92

钢筋切筋机5 Cutting M/C 钢筋弯曲机6 Bending M/C 电焊机 7 Welding M/C BX-300-2 2 2 GJ5-40 2 台7 Unit 台2.8 Unit 台23.4 Unit 台续 进 场 Enter the site as per the requirements 7.5 on site 8 平刨机planer MB106 2 Unit 圆盘锯 9 Disc Saw 插入式振捣器10 Vibrators 平板振动器Plate 11 Compactor 镝灯Dysprosium 12 lamp 2 PZ-501 6 HZ6X-50 10 MJ106 2 台5.5 Unit 台1.5 Unit 台0.5 Unit 盏 Unit 台13 水准仪Level S3 1 Unit 经纬仪14 Theodolite 高压水泵High 15 Pressure Pump Page 12 of 92

台J2 1 Unit 台30m扬程 2 Unit 7

  • 收藏
  • 违规举报
  • 版权认领
下载文档10.00 元 加入VIP免费下载
推荐下载
本文作者:...

共分享92篇相关文档

文档简介:

radiation, and the frame adopts the bridge-cutting energy saving. Steel frame should get hot galvanizing and anti corrosion treatment and the alloy window is treated with anodizated compoundd film, thickness ≥7.5μm. 2.2门卫配电房工程Substation & Gate house 2.2.1门卫配电房的建筑面积为:316.38平方米, 一层框架结构; The building area for Substation & Gate house is 316.38m2, and the structure form is one floor r

× 游客快捷下载通道(下载后可以自由复制和排版)
单篇付费下载
限时特价:10 元/份 原价:20元
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:fanwen365 QQ:370150219
Copyright © 云题海 All Rights Reserved. 苏ICP备16052595号-3 网站地图 客服QQ:370150219 邮箱:370150219@qq.com