当前位置:首页 > 起重机论文中英文资料外文翻译文献
arrived on site ready for use came to dominate construction sites as people realised the advantages of not having to dismantle them between jobs. These new designs did away with the need to have other lifting equipment assisting during rigging - a big contrast to the cumbersome rigging of previous designs. But, before all this could happen came the horrors of the Second World War. By 1940 afl of Europe was completely caught up in the conflict. By the time the war ended, Europe and other parts of the world had been subjected to extraordinary political, economic and social changes that would affect the entire fabric of society, including the construction and crane industries, for many decades to come. In the US, steam locomotives were starting to be replaced by diesel - by 1953 more than 50 per cent of all locomotives would be diesel. During the war the mass production of excavators, scrapers and cranes continued. 1940, for example, saw Thew launch the new 'Lorain Motocrane' series. This consisted of three cranes which, for the first time in history, were mounted on chassis built by the crane manufacturer itselfi The smallest crane, the MC-2, could lift 7.6 tonnes, the MC-2 9.9 tonnes and the MC-3 13.5 tonnes. These cranes were delivered to the army by the thousand, and were also mounted on portals for use as harbour cranes (the MC-4 model). The war had, of course, taken its toll on the number of able-bodied men available to work in the crane
industry and there was a serious shortage of good crane drivers. At Thew, newcomers were taught crane operations over a two-day course presented by A.C Burch, an experienced mechanic and graduate of the Naval Academy, and L.K Jenkins. These two gentlemen were probably the originators of 'operator training' as we know it today. As they had actually designed the Motocrane, both knew it inside out and were pleased to pass on this knowledge.
When the Japanese National Railways committed itself to buying the prototype of a machine designed to remove railway clips, the tide turned. The machine worked splendidly and iVlasuo Tadano toured Japan showing on 35 millimetre film just what it could do. He collected numerous orders for the machine along the way and at the same time seems to have been an early pioneer of the company videos so beloved by today's marketing professionals!
Other countries were also building noteworthy cranes. Italy, in particular, was developing into a source of innovative ideas for the industry.In1948 in Legnano,near Milan,Carlo Raimodi built his first slewing tower crane,a classic top slewer The company was originally established in 1863 as a foundry and had, until making its crane debut, built machines and components for the millwright and other industries. There was now a worldwide boom in construction and this attracted the attention of specialist equipment manufacturers, many of whom
followed the launch of crane ranges with the introduction of concrete mixing equipment. This combination of equipment was supplied in a variety of forms: Reich, Ibag and Liebherr, for example, supplied cranes and concrete mixing machines designed to be used together. Important slewing tower crane manufacturer.
The bridge type hoist crane car consists of protmoted organization,the car frame,the car movement organization,hoisting mechanisms and so on. Its operation structure is composed of reducer,the driving wheel group,the driven wheel group,the transmission shaft and some connect fitting. The core of this structure is the design of the reducer.
This bridge type hoist crane is be used to the hydroelectric power station. It is installed in the expanded workshop of Fengman water and electricity station.It is used to installing,examining and repairing the water-turbine generator set and its accessorial equipments.the equipments
in
the
water
and
electricity
station
are
large or medium-size. These equipments have a high request on the load of bridge type hoist crane , so they also have a high request on the capability of the reducer.
Grab bridge bridge crane is running on the elevated track, the car driven by the lifting of materials crawl grab a bridge-crane. Bridge laying on both sides along the elevated track on the vertical run, lifting
trolley along the bridge in laying the track on the horizontal run, a rectangular scope of work, you can make full use of space below the bridge lifting material from Ground equipment hindered. Grab bridge cranes widely used in power plants, Mei Chang, and other needs of bulk material handling of the occasion, because of the heavy equipment, transportation difficulties installation, testing the quality of their products in general need in the field. Therefore, control equipment requirements for wiring, small size and portability. And the use of fixed-site conditions, also called a random testing equipment manual control functions to ensure the safety of operation. With the lifting of the transport requirements of the mechanical control continuously improve, more and more advanced means of control. At present the domestic bridge crane control system requires people at the scene to control, control methods are backward. In small and medium-sized crane, the most direct control over the use of controllers, car running, Lord, vice hook upgrade, dropped weights and speed
Crane work needs more technology. Construction of tower cranes are the main vertical transportation equipment and also a measure of construction companies and equipment strength of the important logo, in today's increasingly competitive construction market, to meet the construction needs of many construction
共分享92篇相关文档