µ±Ç°Î»ÖãºÊ×Ò³ > ϳÐ̨ʩ¹¤ÖиÖÌ×Ïä©ˮÔÒò·ÖÎö¼°¶Ô²ß
ϳÐ̨ʩ¹¤ÖиÖÌ×Ïä©ˮÔÒò·ÖÎö¼°¶Ô²ß
ÕªÒª£ºµ¥±ÚÓе׸ÖÌ×Ïä×÷ΪˮϳÐ̨ʩ¹¤µÄÁÙʱÐÔµ²Ë®´ëÊ©£¬Æä¸ÖÌ×Ïä©ˮÎÊÌâʱ³£·¢Éú,Ϊ¹¤³ÌÊ©¹¤ÁôÏÂÁËDZÔڵݲȫÒþ»¼¡£¸ÃÎÄÒÔÁ½¸öË®ÏÂÇÅÁº³Ð̨ʩ¹¤ÎªÀý£¬×ܽáÁ˵¥±ÚÓе׸ÖÌ×Ïä©ˮµÄÔÒò, ·ÖÎöÑо¿ÁË©ˮ¹ý³ÌºÍÓ¦¼±¶Â©´ëÊ©£¬Ìá³öÁËÔ¤·Àµ¥±ÚÓе׸ÖÌ×Ïä©ˮµÄ´ëÊ©£¬ÒÔ¹©ÀàËÆ¹¤³Ì×ö²Î¿¼¡£
¹Ø¼ü´Ê£ºµ¥±ÚÓе׸ÖÌ×Ïä ©ˮÔÒò·ÖÎö Ó¦¼±¶Â© Ô¤·À´ëÊ© Analysis of water leakage problem from single-walled steel box and precaution measure
Abstract£ºSingle-walled steel box is temporary retaining measures of underwater pile construction. Its steel boxed leakage problems frequently occur and left a potential safety hazard. In this paper, two underwater bridge pile construction act as case study, the leakage cause of single-walled steel box is summed up, then leakage process is analyzed and emergency measures is studied. Finally, precaution measure is put forward.
Key words£ºsingle-walled steel box analysis of leakage emergency measure precaution measure
1 ¹¤³Ì¸ÅÊö
¹²·ÖÏí92ƪÏà¹ØÎĵµ