Project Name: DSM Zealand Project

Project No.: 418921300-31 Inquiry No. :

Review all (2) Evaluate engineering quality immediately according engineering quality in an documentaobjective manner. 根据工程质量情况及时、客观地进行工程质量评定。 tion 审阅各种资料 A R Quality assessment information 质量评定资料

D Quality Inspection Plan for Electrical Installation Work 电气安装项目质量检验计划 S.N.序号 Items under Control 控制项目 Inspection Description 检 验 内 容 Inspection Method 检查方法 Visual (1)Installation of Transformer 变压器安装 Observation and Record 观察检录 Transformer 变压器 (2)Transformer Suspended Core 变压器吊芯 Visual Observation and Record 观察检录 Inspection (3)Transformer Test 变压器试验 Record 检查记录 C R B R C R Quality Control and Inspection 质量控制与检验 类别 见证点 Submittal of Witness Information 呈交见证材料 1 Bidder: China National Nanhai Engineering Co., Ltd. 45

Project Name: DSM Zealand Project

Project No.: 418921300-31 Inquiry No. :

Observation, (1) Foundation Acceptance 基础验收 Measure with tape观察、尺量 Plumb bob LV 2 Switchgear, Control Panel 低压柜、控制屏 (3)Mechanical Structure adjustment 机械结构调整 (2) Set in place 就位 measure 吊线尺量 Inspection Record 检查记录 Visual (4)Busbar installation 母线安装 Observation and Record 观察检录 Visual (1)Tray installation 桥架安装 Tray 桥架 (2)Grounding 接地 Observation 观察 3 Visual observation and tape measure 观察尺量 Visual 4 Cable 电缆 (1)Cable laying 电缆敷设 Observation 观察 C R C R C R C C R B B R Bidder: China National Nanhai Engineering Co., Ltd. 46

Project Name: DSM Zealand Project

Project No.: 418921300-31 Inquiry No. :

Visual Observation (2)Fix in order 整理固定 and Manual Operation 观察手动 Visual (3)Cable head fabrication 电缆头制作 Observation 观察 Inspection (4)Insulating strength test 绝缘强度测试 Record 检查记录 Visual Observation (1) Conduit installation 保护管穿线安装 and tape measure 观察尺量 Visual Observation (2) Lighting fixture installation 灯具安装 and tape measure 观察尺量 Inspection (3) Insulation Resistance Test 绝缘电阻测试 Record 检查记录 C R C R C R C R C R C 5 Lighting 照明 Bidder: China National Nanhai Engineering Co., Ltd. 47

Project Name: DSM Zealand Project

Project No.: 418921300-31 Inquiry No. :

Inspection (1)Earth Electrode Installation 接地极安装 Record 检查记录 Inspection (2)Grounding conductor laying 接地线敷设 Record 检查记录 Visual B R B R 6 Grounding 接地 Observation (3)Grounding conductor connection 接地线连接 and tape measure 观察尺量 Visual Observation (4)Ground Resistance Test 接地电阻测试 and tape measure 观察尺量 Visual Observation (1)Motor body inspection knockout core 本体检查抽芯 and Inspection Record 观察检查记录 Visual (2)Grounding 接地 Observation 观察 C C R C R B R 7 Electric Motor 电动机 Bidder: China National Nanhai Engineering Co., Ltd. 48

搜索更多关于: (wancheng) 十、QAQC Plan 质量控制计划 的文档
  • 收藏
  • 违规举报
  • 版权认领
下载文档10.00 元 加入VIP免费下载
推荐下载
本文作者:...

共分享92篇相关文档

文档简介:

Project Name: DSM Zealand Project Project No.: 418921300-31 Inquiry No. : Review all (2) Evaluate engineering quality immediately according engineering quality in an documentaobjective manner. 根据工程质量情况及时、客观地进行工程质量评定。 tion 审阅各种资料 A R Quality assessment information 质量评定资料 D Quality Insp

× 游客快捷下载通道(下载后可以自由复制和排版)
单篇付费下载
限时特价:10 元/份 原价:20元
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:fanwen365 QQ:370150219
Copyright © 云题海 All Rights Reserved. 苏ICP备16052595号-3 网站地图 客服QQ:370150219 邮箱:370150219@qq.com